| Código S03CJT | InfDes | Ud | Resumen ANDAMIOS TUBULARES | CanPres | PrPres | ImpPres | ||
| 1 | S03CJT010 |
| m2 | ALQUILER MENSUAL ANDAMIO MET.TUB. | 1,80 | ||
| 2 | S03CJT020 |
| m2 | ALQ./INSTAL.1 MES. AND. MET.TUB. h<8 m. | 8,07 | ||
| 3 | S03CJT030 |
| m2 | ALQ./INST.1 MES. AND.MET.TUB.8m | 9,08 | ||
| 4 | S03CJT040 |
| m2 | ALQ./INST.1 MES. AND.MET.TUB.12m | 9,42 | ||
| 5 | S03CJT050 |
| m2 | ALQ./INST.1 MES. AND.MET.TUB.15m | 9,84 | ||
| 6 | S03CJT060 |
| m2 | ALQ./INST.1 MES. AND.MET.TUB.20m | 10,20 | ||
| 7 | S03CJT070 |
| m2 | ALQ./INST.1 MES.ANDAMIO.MET.TUB. h>25 m. | 10,46 | ||
| 8 | S03CJT080 |
| m2 | ALQ./INSTAL. 2 MESES. ANDAM. h<8 m. | 9,57 | ||
| 9 | S03CJT090 |
| m2 | ALQ./INSTAL. 2 MESES. ANDAM. 8m. | 10,88 | ||
| 10 | S03CJT100 |
| m2 | ALQ./INSTAL. 2 MESES. ANDAM. 12m. | 11,22 | ||
| 11 | S03CJT110 |
| m2 | ALQ./INSTAL. 2 MESES. ANDAM. 15m. | 11,64 | ||
| 12 | S03CJT120 |
| m2 | ALQ./INSTAL. 2 MESES. ANDAM. 20m. | 12,00 | ||
| 13 | S03CJT130 |
| m2 | ALQ./INSTAL. 2 MESES. ANDAM. h>25 m. | 12,26 | ||
| 14 | S03CJT140 |
| m2 | ALQ./INSTAL. 3 MESES. AND. MET.TUB. h<8m | 11,67 | ||
| 15 | S03CJT150 |
| m2 | ALQ./INSTAL. 3 MESES. ANDAM. 8m. | 12,68 | ||
| 16 | S03CJT160 |
| m2 | ALQ./INSTAL. 3 MESES. ANDAM. 12m. | 13,02 | ||
| 17 | S03CJT170 |
| m2 | ALQ./INSTAL. 3 MESES. ANDAM. 15m. | 13,44 | ||
| 18 | S03CJT180 |
| m2 | ALQ./INSTAL. 3 MESES. ANDAM. 20m. | 13,80 | ||
| 19 | S03CJT190 |
| m2 | ALQ./INSTAL. 3 MESES. ANDAM. h>25 m. | 14,06 | ||
| 20 | S03CJT200 |
| m2 | ALQ./INSTAL. 4 MESES. ANDAM. h<8 m. | 13,47 | ||
| 21 | S03CJT210 |
| m2 | ALQ./INSTAL. 4 MESES. ANDAM. 8m. | 14,48 | ||
| 22 | S03CJT220 |
| m2 | ALQ./INSTAL. 4 MESES. ANDAM.12m. | 14,82 | ||
| 23 | S03CJT230 |
| m2 | ALQ./INSTAL. 4 MESES. ANDAM. 15m. | 15,24 | ||
| 24 | S03CJT240 |
| m2 | ALQ./INSTAL. 4 MESES. ANDAM. 20m. | 15,60 | ||
| 25 | S03CJT250 |
| m2 | ALQ./INSTAL. 4 MESES. ANDAM. h>25m. | 15,86 | ||
| 26 | S03CJT260 |
| m2 | ALQ./INSTAL. 6 MESES. ANDAM. h<8 m. | 17,07 | ||
| 27 | S03CJT270 |
| m2 | ALQ./INSTAL. 6 MESES. ANDAM. 8m. | 18,08 | ||
| 28 | S03CJT280 |
| m2 | ALQ./INSTAL. 6 MESES. ANDAM. 12m. | 18,42 | ||
| 29 | S03CJT290 |
| m2 | ALQ./INSTAL. 6 MESES. ANDAM. 15m | 18,84 | ||
| 30 | S03CJT300 |
| m2 | ALQ./INSTAL. 6 MESES. ANDAM. 20m. | 19,20 | ||
| 31 | S03CJT310 |
| m2 | ALQ./INSTAL. 6 MESES. ANDAM. h>25 m. | 19,46 | ||
| 32 | S03CJT320 |
| m2 | ALQ./INSTAL.12 MESES. ANDAM. h<8 m. | 17,07 | ||
| 33 | S03CJT330 |
| m2 | ALQ./INSTAL.12 MESES. ANDAM. 8m. | 29,18 | ||
| 34 | S03CJT340 |
| m2 | ALQ./INSTAL.12 MESES. ANDAM.12m. | 29,52 | ||
| 35 | S03CJT350 |
| m2 | ALQ./INSTAL.12 MESES. ANDAM.15m. | 29,94 | ||
| 36 | S03CJT360 |
| m2 | ALQ./INSTAL.12 MESES. ANDAM. 20m. | 30,30 | ||
| 37 | S03CJT370 |
| m2 | ALQ./INSTAL 12 MESES. ANDAM. h>25m. | 30,56 | ||
| 38 | S03CJT380 |
| m2 | TRANSP. 50 Km. CAMIÓN TRAILER 700 m2 | 961,25 | ||
| 39 | S03CJT390 |
| m2 | TRANSP. 50 Km. CAMIÓN 2-3 EJES 400 m2 | 754,06 | ||
| 40 | S03CJT400 |
| m2 | TRANSP. 50 Km. FURGONETA 100 m2 | 536,41 |