Raíz |
![]() |
Fin |
![]() |
| BASE DE PRECIOS DE LA CONSTRUCCIÓN DEL GOBIERNO DE EXTREMADURA -> PRECIOS DESCOMPUESTOS DE EDIFICACIÓN -> RED DE SANEAMIENTO -> ARQUETAS Y POZOS -> POZOS |
| Código E03APP | InfDes | Ud | Resumen PREFABRICADOS | CanPres | PrPres | ImpPres | ||
| 1 | E03APP010 |
| ud | BASE POZO PREFAB.HGÓN D=80 cm. | 178,08 | ||
| 2 | E03APP020 |
| ud | BASE POZO PREFAB.HGÓN D=100cm. | 419,84 | ||
| 3 | E03APP030 |
| ud | BASE POZO PREFAB.HGÓN D=120cm. | 443,95 | ||
| 4 | E03APP040 |
| ud | CONO ASIM.POZO PREF.H.M.80/62 | 94,29 | ||
| 5 | E03APP050 |
| ud | CONO ASIM.POZO PREF.H.A.100/60 | 271,72 | ||
| 6 | E03APP060 |
| ud | CONO ASIM.POZO PREF.H.A.120/60 | 339,91 | ||
| 7 | E03APP070 |
| ud | LOSA REMATE POZO H.A. D=100/60 | 208,76 | ||
| 8 | E03APP080 |
| ud | SO.CONO ARRAN. PO.D=80 cm. h=160 | 173,89 | ||
| 9 | E03APP090 |
| ud | SO.CONO ARRAN.PO.D=100 cm. h=160 | 198,89 | ||
| 10 | E03APP100 |
| ud | SO.CONO ARRAN.PO.D=120 cm. h=180 | 230,86 | ||
| 11 | E03APP110 |
| m. | DESARR.POZO PREFAB. HM D=80 | 58,58 | ||
| 12 | E03APP120 |
| m. | DESARR.POZO PREFAB. HM D=100 | 24,80 | ||
| 13 | E03APP130 |
| m. | DESARR.POZO PREFAB. HM D=120 | 98,21 | ||
| 14 | E03APP140 |
| m. | DESARR.POZO PREFAB. HA D=120 | 28,25 |
Inicio |